Gold Member Since 2006
Audited Supplier
Chengde Jinjian Testing Instrument Co., Ltd.

Clamp, Hydrostatic Test, Plastic Pipes manufacturer / supplier in China, offering End Caps for Hydrostatic Pressure Tester/ Enclosure for Plastic Pipes, Differencial Scanning Calorimeter, Mechanical Stability Tester/Testing Machine and so on.

(/ )

Supplier Homepage Product Testers for Plastic Pipes End Caps for Hydrostatic Pressure Tester/ Enclosure for Plastic Pipes

End Caps for Hydrostatic Pressure Tester/ Enclosure for Plastic Pipes

FOB Price: US $100 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $100/ Piece
Get Latest Price
Payment Terms: L/C, T/T, D/P, Paypal, Money Gram, Western Union
Basic Info
  • Model NO.: JJEC-A
  • Accuracy Grade: 1
  • Loading Method: Static Load
  • Control: Computer Control
  • Type: Material Testing Machine
  • Load Way: Mechanical Load
  • Display: Digital
  • Weight: 0-100Kg
Product Description
JJEC-A Endcaps
JJEC-A End caps is designed for internal hydrostatic pressure testing of pipes and fittings. It is used to seal the sample in order to generate internal pressure in the sample, with the characters of :
1)       Patented structure ensures easy mounting and perfect sealing. Split type clamps help to realize automatic centering.
2)       Hollow-out design makes it lighter in weight, easier for observation and operation. For example, Single-end weight (after assembly) of DN400 encaps less than 50kg and the weight of clamps is 7.3kg.
3)       Hollow-out design makes it lighter in weight, easier for observation and operation. For example, Single-end weight (after assembly) of DN400 encaps less than 50kg and the weight of clamps is 7.3kg.
4)       End caps are produced with a specific depth from O-ring to the internal bottom which ensures that even on chamfered and oval PE pipes.
5)       Stainless steel chain is used to connect upper and lower end caps, to avoid the lower one go down to the bottom of water thank if specimen brittle rupture.
6)       There is air release valve to discharge the air left in the pipe.
7)       Air resource inlet and drain port are introduced to drain water after testing for big diameter end caps.
Send your message to this supplier
Avatar
Ms. Jilly
Manager
*From:
To: Ms. Jilly
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category